20/7/2012 Total Construction was recently charged with the provision of a new loading dock area for Goodman Fielder’s Victorian production facility. Leda was selected to install and commission two loading docks for the job. As part of Leda’s works, the supply of the steel work to cast in was fast tracked to enable the builder to progress works and install the loading docks towards the end of the project. This has the benefit of minimising damage of equipment during construction. Leda has a full range of manual and automated dock levellers for the loading and unloading of trucks. More information on our Dock levellers.