Leda Security in October 2010 supplied a large cantilever gate for DHL's Ingleburn site in Sydney. The works were conducted for Knight Frank and involved the installation of the cantilevered gate and an additional pedestrian gate. The driveway is extremely busy so a Leda top tier motor with 100% duty cycle was selected. Installation of the running rail base was unique due to a deep gully located off the driveway. Leda's designers had to specifically design a foundation and changes to the gate to suit. Additionally, the gate is on a slope so was raked to match the terrain.