As one of the world leaders in shallow mount footing technology, Leda is increasingly being commissioned to supply and install security bollards with shallow mount (<200mm) concrete footings.
In what is considered to be an industry first Leda was contracted to design and install an impact rated high security bollard system over an existing “pre stressed slab”. Understandably none of the pre-stressed cables could be interfered with so Leda’s engineers designed a 50mm keyway that was cut into the top into the existing slab before installing the (3.5 tonne @ 48kmhr) impact rated bollard system for our clients.