Bollard installations in busy CBD sites often need to be carried out in off peak periods to avoid traffic disruptions. The successful installation of these high security SP1000 fixed bollards at Sydney’s Wynyard Walk was conducted over a series of evenings.
Wynyard Walk provides a pedestrian walkway connecting the Barangaroo precinct with Wynyard Station. These Bollards unique to Leda with a crash rating (7.5t @ 80km/h) only require a 114mm deep footing which avoids the need for large deep concrete footings and disruption to other existing services.